Asset Publisher

LOFT Mission Requirements Document

LOFT Mission Requirements Document

Publication date: 11 February 2013

Authors: LOFT Study Team

Issue: 3, Revision: 6
Year: 2013

Copyright: ESA

LOFT is an M-class mission candidate for the M3 slot within the Cosmic Vision programme, for a planned launch between 2022 and 2024. LOFT, with 3 other science missions, was recommended by the Space Science Advisory Committee (SSAC) to enter an assessment study (Phase 0), starting by an ESA internal study followed by parallel industrial study activities.

Within the M3 boundary conditions, the readiness for launch by end 2022/2024 is a severe requirement which in practice requires designing the space segment without major technology developments and with minimum developments risks. Therefore, only technologies with estimated Technology Readiness Levels (TRL) of at least 5 by the end of the Phase A (estimated at the end of 2014) may be used.

This document aims at providing a complete and comprehensive list of all high level mission requirements (including S/C and payload, launcher, ground segment and operations) necessary to achieve the science goals detailed in [LOFT Science Requirements Document (SciRD), SRE-SA/LOFT/2011-001, Issue 1, Rev. 7]. Accordingly it is an applicable document that shall be complied with for all mission design activities. The MRD will be further reviewed matching the results of future study phases (e.g. definition phase) to finally evolve into the System Requirements Document at the start of the implementation phase.

Link to publication
Last Update: Sep 1, 2019 8:48:58 AM
3-Dec-2024 00:15 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/8Jgp3eA

Images And Videos

Related Publications

Related Links

See Also

Documentation