Report for Period 26 November to 2 DecemberDuring the reporting period the mission operations have been conducted according to the plan.

The table below shows a chronology of the main activities in the reporting period:

MET (Day) Date DOY VPER# Main Activity
383 26/11/06 330 219

Routine Mission operations.
Copy of previously missed SPICAV & ASPERA science for redump.

384 27/11/06 331 220 Routine Mission operations.
Complete dump of missed science data.
385 28/11/06 332 221 Routine Mission operations
386 29/11/06 333 222 Routine Mission operations
387 30/11/06 334 223 Routine Mission operations
388 01/12/06 335 224 Routine Mission operations
389 02/12/06 336 225 Routine Mission operations.
Transient loss uplink from Cebreros.

At the end of the last Cebreros pass in the reporting period (DOY 336, 16:00z) Venus Express was orbiting Venus at 252 million km from the Earth. The one-way signal travel time was 840 seconds.


Payload Activities

ASPERA
The instrument is regularly operated as part of the routine plan. All science data lost on DOY 329 was subsequently retrieved.

MAG
The instrument is regularly operated as part of the routine plan.

PFS
This instrument is OFF and is not operated.

SPICAV
The instrument is regularly operated as part of the routine plan. All science data lost on DOY 329 was subsequently retrieved.

VeRA
The USO is nominally powered but muted. There were no RSI activities during this reporting period.

VIRTIS
The instrument is regularly operated as part of the routine plan.

VMC
The instrument is regularly operated as part of the routine plan.


Mission Planning

Short Term Planning
Operations of STP030 were executed successfully and the planning of STP031 was completed in time.

Long Term Planning
A decision whether to request DSN support for the movie observation has not been taken yet.


Future Milestones

The second Earth occultation season will start in December with additional Radio Science operations with the ESA New Norcia station.

Planning of the entire Christmas period will be completed next week (STPs 34 through 37, plus MTPs 11 and 12).

An orbit correction manoeuvre is to be performed at pericenter passage on 15 December, followed by a touch-up manoeuvre on 21 December.

Last Update: 1 September 2019
22-Dec-2024 05:19 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/wxlErXw

Images And Videos

Related Publications

Related Links

See Also

Documentation