No. 62 - Earth Occultation Observations
The table below shows a chronology of the main activities in the reporting period:
MET (Day) | Date | DOY | VPER# | Main Activity |
432 | 14/01/07 | 014 | 268 | Routine Mission Operations |
433 | 15/01/07 | 015 | 269 | Routine Mission Operations |
434 | 16/01/07 | 016 | 270 | Routine Mission Operations |
435 | 17/01/07 | 017 | 271 | Routine Mission Operations |
436 | 18/01/07 | 018 | 272 | Routine Mission Operations |
437 | 19/01/07 | 019 | 273 | Routine Mission Operations |
438 | 20/01/07 | 020 | 274 | Routine Mission Operations |
At the end of the last Cebreros pass in the reporting period (DOY 020, 17:00z) Venus Express was orbiting Venus at 233 million km from the Earth. The one-way signal travel time was 779 seconds.
Payload Activities
ASPERA
The instrument is regularly operated as part of the routine plan.
MAG
The instrument is regularly operated as part of the routine plan.
PFS
This instrument is OFF and is not operated.
SPICAV
The instrument is regularly operated as part of the routine plan.
VeRA
The USO has been unmuted on DoY 014, 016, 018 and 020 to conduct the planned Earth occultation observations.
VIRTIS
The instrument is regularly operated as part of the routine plan.
VMC
The instrument is regularly operated as part of the routine plan.
Mission Planning
Short Term Planning
Operations of STP037 were executed successfully and the planning of STP038 was completed in time.
Future Milestones
The definition and testing of operations during quadrature is on-going; the next quadrature phase will start in May 2007.