No. 75 - Mission Update
The table below shows a chronology of the main activities in the reporting period:
MET (Day) | Date | DOY | VPER# | Main Activity |
523 | 15/04/07 | 105 | 359 | Routine Mission operations |
524 | 16/04/07 | 106 | 360 | Routine Mission operations |
525 | 17/04/07 | 107 | 361 | Routine Mission operations |
526 | 18/04/07 | 108 | 362 | Routine Mission operations |
527 | 19/04/07 | 109 | 363 | Routine Mission operations. TM bit rate increased to 182 kbps |
528 | 20/04/07 | 110 | 364 | Routine Mission operations |
529 | 21/04/07 | 111 | 365 | Routine Mission Operations |
At the end of the last Cebreros pass in the reporting period (DOY 111, 18:00z) Venus Express was orbiting Venus at 162 million km from the Earth. The one-way signal travel time was 541 seconds.
Payload Activities
ASPERA
The instrument is regularly operated as part of the routine plan.
MAG
The instrument is regularly operated as part of the routine plan.
PFS
This instrument is OFF and is not operated.
SPICAV
A test of new sequences for SPICAV shutter operation was executed on DOY 104. The test was successful. The instrument is operated as part of routine plan.
VeRA
No radio science is performed this week.
VIRTIS
The instrument is regularly operated as part of the routine plan.
VMC
The instrument is regularly operated as part of the routine plan.
Future Milestones
The testing of operations during quadrature is on-going; the next quadrature phase will start in May 2007. Quadrature readiness review is planned to take place on the 26 April 2007.