No. 77 - Mission Update
The table below shows a chronology of the main activities in the reporting period:
MET (Day) | Date | DOY | VPER# | Main Activity |
537 | 29/04/07 | 119 | 373 | Routine Mission Operations Recovery of lost TM caused by bad weather at Cebreros |
538 | 30/04/07 | 120 | 374 | Routine Mission Operations |
539 | 01/05/07 | 121 | 375 | Routine Mission Operations |
540 | 02/05/07 | 122 | 376 | Routine Mission Operations |
541 | 03/05/07 | 123 | 377 | Routine Mission Operations |
542 | 04/05/07 | 124 | 378 | Routine Mission Operations |
543 | 05/05/07 | 125 | 379 | Routine Mission Operations. Orbital Control Manoeuvre 04:34-07:34, 1.01 ms-1 |
At the end of the last Cebreros pass in the reporting period (DOY 125, 18:00z) Venus Express was orbiting Venus at 147 million km from the Earth. The one-way signal travel time was 489 seconds.
Payload Activities
ASPERA
The instrument is regularly operated as part of the routine plan.
MAG
The instrument is regularly operated as part of the routine plan.
PFS
This instrument is OFF and is not operated.
SPICAV
The instrument is operated as part of the routine plan.
VeRA
Occultation measurements were carried out using the New Norcia groundstation on DOY 120 & 122. These and all future observations were/will be carried out with X-band only until further notice.
VIRTIS
The instrument is regularly operated as part of the routine plan.
VMC
The instrument is regularly operated as part of the routine plan.
Future Milestones
The next quadrature phase will start in May 2007.