No. 84 - Mission Update

No. 84 - Mission Update

Report for Period 17 June to 23 June 2007Routine observations took place during this reporting period and occurred as planned.

The table below shows a chronology of the main activities in the reporting period:

MET (Day) Date DOY VPER# Main Activity
586 17/06/07 168 422 Routine Mission Operations.
587 18/06/07 169 423

Routine Mission Operations.

588 19/06/07 170 424

Special activities: update of onboard control procedures (OBCP's)

589 20/06/07 171 425

Routine Mission Operations

590 21/06/07 172 426

Routine Mission Operations

591 22/06/07 173 427

Routine Mission Operations

592 23/06/07 174 428 Routine Mission Operations

At the end of the last Cebreros pass in the reporting period (DOY 174, 19:22z) Venus Express was orbiting Venus at 88.3 million km from the Earth. The one-way signal travel time was 294 seconds.

Payload Activities

ASPERA
The instrument was regularly operated as part of the routine plan.

MAG
The instrument was regularly operated as part of the routine plan.

PFS
This instrument was OFF and was not operated.

SPICAV
The instrument was regularly operated as part of the routine plan. The OBCP upload on DOY 170 included the new OBCP (6910) for SPICAV shutter operation.

VeRA
Three occultation observations were performed over New Norcia on DOY 168, 170 and 173.

VIRTIS
The instrument was regularly operated as part of the routine plan. 

VMC
The instrument is operated as part of the routine plan.

Future Milestones

PFS tests are being prepared to try to move the scanner during a wheel off-loading (WOL).

Testing of the newly uploaded SPICAV on-board control procedures.

Last Update: 1 September 2019
24-Apr-2024 18:48 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/wxlzkyw

Images And Videos

Related Publications

Related Links

See Also

Documentation