No. 104 - Quadrature Operations
The table below shows a chronology of the main activities in the reporting period:
MET (Day) | Date | DOY | Main Activity |
726 | 04/11/07 | 308 | Pass skipped for cooldown before science ops |
727 | 05/11/07 | 309 | Routine operations |
728 | 06/11/07 | 310 | Pass skipped for cooldown before science ops |
729 | 07/11/07 | 311 | Routine Operations |
730 | 08/11/07 | 312 | Pass skipped for cooldown before science ops |
731 | 09/11/07 | 313 | Routine Operations |
732 | 10/11/07 | 314 | Pass skipped for cooldown before science ops |
At the end of the last Cebreros pass in the reporting period (DOY 314, 18:00z) Venus Express was orbiting Venus at 118.0 million km from the Earth. The one-way signal travel time was 393 seconds.
The 9 November 2007 was the second anniversary of Venus Express launch.
Payload Activities
ASPERA
The instrument was operated as part of the routine plan.
MAG
The instrument was operated as part of the routine plan.
PFS
The instrument was not operated during the reporting period.
SPICAV
The instrument was operated as part of the routine plan.
VeRA
No RSI activities took place this week.
VIRTIS
VIRTIS operations were resumed on DOY 308 and since then the instrument was operated regularly as part of the routine plan.
VMC
The instrument was operated as part of the routine plan.
Future Milestones
- Quadrature phase ends - 23 November 2007