No. 152 - Eclipse Season
The table below shows a chronology of the main activities:
MET (Day) | Date | DOY | Main Activity |
1062 | 05/10/08 | 279 | Routine Operations |
1063 | 06/10/08 | 280 | Routine Operations |
1064 | 07/10/08 | 281 | Routine Operations |
1065 | 08/10/08 | 282 |
Routine Operations |
1066 | 09/10/08 | 283 | Routine Operations |
1067 | 10/10/08 | 284 |
Routine Operations |
1068 | 11/10/08 | 285 | Routine Operations |
At the end of the last Cebreros pass in the reporting period (DOY 285) Venus Express was orbiting Venus at 198.9 million km from the Earth. The one-way signal travel time was 663 seconds.
Payload Activities
ASPERA
The instrument was regularly operated as part of the routine plan.
MAG
The instrument was regularly operated as part of the routine plan.
PFS
The instrument was not operated during the reporting period.
SPICAV
The instrument was regularly operated as part of the routine plan.
VeRA
No measurements were taken during the reporting period.
VIRTIS
The instrument was regularly operated as part of the routine plan.
VMC
The instrument was regularly operated as part of the routine plan.
Future Milestones
- High gain antenna (HGA1) S-band carrier power test is planned for 15 December 2008
- Next quadrature phase will start on 19 December 2008
---