Status report archive

Status report archive

Report for Period 18 October to 24 October 2009The Venus Express spacecraft and instruments performed nominally during this week. Two orbit control manoeuvres were successfully performed; one to lower the orbit's apocentre altitude and one to raise the pericentre altitude. On DOY 293 the regular DDOR measurements were performed.
Published: 28 October 2009
Report for Period 11 October to 17 October 2009The Venus Express spacecraft and instruments performed nominally during this week. A series of atmospheric drag experiments has been completed in the reporting period.
Published: 21 October 2009
Report for Period 4 October to 10 October 2009The Venus Express spacecraft and instruments performed nominally during this week.
Published: 14 October 2009
Report for Period 27 September to 3 October 2009The Venus Express spacecraft and instruments performed nominally during this week. On DOY 271 the regular DDOR measurements were performed.
Published: 7 October 2009
Report for Period 20 September to 26 September 2009The Venus Express spacecraft and instruments performed nominally during this week.
Published: 30 September 2009
Report for Period 13 September to 19 September 2009The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season concluded this week, with the last five observations in the series carried out in this reporting period.
Published: 23 September 2009
Report for Period 6 September to 12 September 2009The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with three observations carried out in this reporting period.
Published: 16 September 2009
Report for Period 30 August to 5 September 2009The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with five observations carried out in this reporting period.
Published: 9 September 2009
Report for Period 23 August to 29 August 2009The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with three observations carried out in this reporting period.
Published: 2 September 2009
Report for Period 16 August to 22 August 2009The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with two observations carried out in this reporting period.
Published: 26 August 2009
Report for Period 9 August to 15 August 2009The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with two observations carried out in this reporting period. On DOY 224 the regular DDOR measurements were performed.
Published: 19 August 2009
Report for Period 2 August to 8 August 2009The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with three observations carried out in this reporting period.
Published: 12 August 2009
Report for Period 26 July to 1 August 2009The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with three observations performed in this reporting period. An orbit control manoeuvre (OCM) was carried out in the night of 25-26 July between 23:06 and 02:07 UT. This...
Published: 5 August 2009
Report for Period 19 July to 25 July 2009The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with six observations carried out in this reporting period. On DOY 206 the regular DDOR measurements were performed.
Published: 29 July 2009
Report for Period 12 July to 18 July 2009The Venus Express spacecraft and instruments performed nominally during this week. The mission's seventh season of Earth occultation experiments started on 16 July 2009.
Published: 22 July 2009
Report for Period 5 July to 11 July 2009The Venus Express spacecraft and instruments performed nominally during this week.
Published: 15 July 2009
Report for Period 28 June to 4 July 2009The Venus Express spacecraft and instruments performed nominally during the last week of quadrature operations. The spacecraft remained in quadrature configuration until 3 July, DOY 185. As part of the quadrature operations the Venus Express spacecraft flew a tilted attitude during Earth contact with the...
Published: 8 July 2009
Report for Period 21 June to 27 June 2009The Venus Express spacecraft and instruments performed nominally during this week of quadrature operations. As part of the quadrature operations the Venus Express spacecraft is flying a tilted attitude during Earth contact with the Cebreros ground station. The 10° attitude tilt with respect to the...
Published: 1 July 2009
Report for Period 14 June to 20 June 2009The Venus Express spacecraft and instruments performed nominally during this week of quadrature operations. As part of the quadrature operations the Venus Express spacecraft is flying a tilted attitude during Earth contact with the Cebreros ground station. The 10° attitude tilt with respect to the...
Published: 24 June 2009
Report for Period 7 June to 13 June 2009The Venus Express spacecraft and instruments performed nominally during this week of quadrature operations. The swap from High Gain Antenna 2 (HGA2) to HGA1 and the associated 180° flip of the spacecraft around its Z-axis were successfully executed prior to the Cebreros ground station pass on 8 June (DOY...
Published: 17 June 2009
12-Nov-2024 13:09 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/p/gAjBxxA