• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • BepiColombo

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Background Science
    • Background Science
    • Mercury Interior
    • Mercury Surface
    • Mercury Atmosphere
    • General Relativity
    • Mercury Planetary Orbiter
    • Spacecraft
    • Instruments
    • Mercury Magnetospheric Orbiter
    • Spacecraft
    • Instruments
    • Mission Operations
    • Getting to Mercury
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Journal Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    BepiColombo To Enter Implementation Phase

    26 Feb 2007

    The final approval for the BepiColombo mission to enter the implementation phase has been given last Friday by the Science Programme Committee (SPC) and Astrium GmbH has been selected as Prime Contractor for this scientific Corner Stone mission.

    The BepiColombo mission entered into its definition phase in July 2001 with a competitive study carried out by two prime contractors, Astrium GmbH and Alcatel Alenia Space–I.

    Following a tender procedure in 2006, Astrium GmbH was selected as the prime contractor for the implementation phase (phases B2, C, D and E1) of the mission. An industrial core team, led by the prime contractor, is composed of:

    • Astrium GmbH (Friedrichshafen) as Prime Contractor
    • Astrium Ltd as Co-Prime Contractor for the Mechanical and Propulsion Bus
    • Alcatel Alenia Space Italy as Co-Prime Contractor for the Spacecraft Assembly integration and test, the Communications Subsystem engineering, the MPO thermal control and the Electrical Power Subsystem engineering
    • Astrium SAS as subcontractor for the central software
    • Tecnologica (E) / IGG (UK) as subcontractor for the Coordinated Parts Procurement

    The procurement proposal, based on this industrial core team, has been approved by ESA's Industrial Policy Committee (IPC) at their meeting on 30/31 January 2007.

    The degree of technology readiness and the programmatic situation of the science programme enable the BepiColombo project to enter into its implementation phase with a launch planned in August 2013 and a start of the scientific operations around Mercury in 2019.

    The BepiColombo Mission

    The different elements comprising the Mercury Composite Spacecraft

    The interdisciplinary BepiColombo mission is devoted to the thorough exploration of Mercury and its environment with the aim to understand the process of planetary formation and evolution in the hottest part of the proto-planetary nebula as well as to understand similarities and differences between the magnetospheres of Mercury and Earth. The mission will be carried out as an ESA project in collaboration with JAXA (Japan Aerospace Exploration Agency). The baseline mission consists of two scientific orbiters: the Mercury Planetary Orbiter (MPO) and the Mercury Magnetospheric Orbiter (MMO). The orbiters will be mounted on the Mercury Transfer Module (MTM) that together make up the Mercury Composite Spacecraft (MCS). The MCS will be launched on a Soyuz-Fregat 2-1B from Kourou, French Guyana.

    The MPO will carry eleven highly sophisticated scientific instruments, ten of which will be provided by Principal Investigators through national funding by ESA Member States and one from Russia. The MMO payload consists of five scientific experiments that will also be provided by nationally funded Principal investigators, one European and four from Japan. Significant European contributions are provided to the Japanese instruments.

    ESA is responsible for the MPO, including instrument integration, and JAXA is responsible for the MMO. ESA will also be responsible for the integration of both scientific orbiters with the MTM into the MCS, for the launch and for the cruise operations up to the insertion of the MPO and the MMO into their dedicated orbits planned in 2019. Finally, ESA is responsible for the mission and scientific operations of the MPO in its orbit around Mercury.


    Last Update: 06 Mar 2007

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=40691

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions