Mounting the MPO on the ground handling trolley
The overhead crane and special lifting adapter (top of image) bear the weight of the BepiColombo Mercury Planetary Orbiter Structural and Thermal Model as it is moved into position and bolted to the ground handling trolley.
Last Update: 1 September 2019