NIRSpec inspection after shipment

Date: 04 February 2014
Satellite: JWST
Depicts: NIRSpec optical metrology tests
Copyright: NASA / Chris Gunn
NIRSpec in the Space Systems Development and Integration Facility (SSDIF) cleanroom at Goddard Space Flight Center. ESA, Astrium (blue hoods) and NASA technicians (white hoods) work together to perform the optical metrology measurements that confirm that NIRSpec's alignment has not changed as a result of the shipment (in September 2013) to Goddard
Last Update: 1 September 2019