Report for Period 29 June to 5 July 2008All operations have been nominal during the reporting period. The telecommunication (TC) bit rate has been increased to 2 kbps.
Published: 9 July 2008
Report for Period 22 June to 28 June 2008The reporting period was the first complete week of nominal science operations after the solar conjunction phase.
Published: 2 July 2008
Report for Period 15 June to 21 June 2008The reporting period covered the last days of solar conjunction phase operations (ending on 19 June), the reconfiguration of the solid state mass memory (SSMM) and the resume of science activities. Commanding tests and recording of open loop data continued until the exit from the conjunction phase.
Published: 24 June 2008
Report for Period 8 June to 14 June 2008The reporting period covered conjunction phase operations. During this phase, groundstation pass operations are reduced: no science activities are carried out, no solid state mass memory (SSMM) dumping takes place.
Published: 17 June 2008
Report for Period 10 May to 6 June 2008Rosetta is continuing its fourth orbit around the Sun as part of its interplanetary journey. The spacecraft distance from the Sun will now increase to reach a maximum of about 2.26 AU in December 2008.
Published: 10 June 2008
Report for Period 1 June to 7 June 2008The reporting period covered conjunction phase operations. During this phase, groundstation pass operations are reduced: no science activities are carried out, no solid state mass memory (SSMM) dumping takes place.
Published: 10 June 2008
Report for Period 25 May to 31 May 2008Operations have been nominal during the reporting period. The conjunction operations started on 30 May.
Published: 3 June 2008
Report for Period 18 May to 24 May 2008 Routine operations continued nominally as planned.
Published: 27 May 2008
Report for Period 11 May to 17 May 2008Operations have been nominal during the reporting period. Four passes were split into two parts in order to allow ground station support for Phoenix delta DORs. On 16 May, a trajectory control manoeuvre (TCM) was successfully performed. Telecommunication bit rate was decreased in preparation for the...
Published: 20 May 2008
Report for Period 4 May to 10 May 2008Routine operations continued nominally as planned.
Published: 13 May 2008
Report for Period 12 April to 9 May 2008Rosetta is continuing its fourth orbit around the Sun as part of its interplanetary journey. The spacecraft distance from the Sun will now increase to reach a maximum of about 2.26 AU in December 2008.
Published: 13 May 2008
Report for Period 27 April to 3 May 2008Operations have been nominal during the reporting period. During this week the new on-board control procedure (OBCP) to enable/disable the routing of virtual channel zero (VC0, for spacecraft housekeeping telemetry) was routinely used.
Published: 6 May 2008
Report for Period 20 April to 26 April 2008Routine operations continued nominally as planned.
Published: 29 April 2008
Report for Period 13 April to 19 April 2008Routine operations continued nominally as planned.
Published: 22 April 2008
Report for Period 15 March to 11 April 2008Rosetta is continuing its 4th orbit around the Sun as part of its interplanetary journey. The spacecraft distance from the Sun is increasing and will reach a maximum of about 2.26 AU in December 2008.
Published: 18 April 2008
Report for Period 6 April to 12 April 2008Routine operations continued nominally as planned.
Published: 15 April 2008
Report for Period 30 March to 5 April 2008Routine operations continued nominally as planned.
Published: 8 April 2008
Report for Period 23 March to 29 March 2008Routine operations continued nominally as planned.
Published: 2 April 2008
Report for Period 16 February to 14 March 2008Rosetta is continuing its 4th orbit around the Sun as part of its interplanetary journey. The spacecraft distance from the Sun is increasing and will reach a maximum of about 2.26 AU in December 2008.
Published: 25 March 2008
Report for Period 16 March to 22 March 2008Routine operations continued nominally as planned.
Published: 25 March 2008