Asset Publisher

No. 252 - Tests with ESA's new ground station at Malargüe, end of the thirteenth occultation season, and start of the twenty-second solar eclipse season

No. 252 - Tests with ESA's new ground station at Malargüe, end of the thirteenth occultation season, and start of the twenty-second solar eclipse season

Report for the period 16 September to 13 October 2012This reporting period covers four weeks of Venus Express operations, including tests with ESA's new ground station at Malargüe, the end of the thirteenth occultation season and the start of the twenty-second solar eclipse season.

Cebreros ground station
All Cebreros (CEB) ground station activities were nominal during this reporting period. The spacecraft systems, payload and ground stations showed excellent performance.

Regular maintenance of the ground station was scheduled on 9 and 10 October. Such maintenance activities and regular data downlinks from the spacecraft are carried out during the day in order to minimise operational costs. This means that the ground station is unavailable for part of the work day (from 10:00 to 15:00 local time) while maintenance activities are carried out. Thus, the time available for data downlinks from the spacecraft is reduced on days when ground station maintenance is performed.

The spacecraft's telemetry bit rate was switched to 182 kbps beginning 17 September; the primary high gain antenna (HGA-1) was in use. The bit rate was again decreased to 152 kbps before a pass with the Cebreros ground station on 4 October. The bit rates are regularly changed as the spacecraft distance from Earth changes, in order to have the maximum downlink bit rate while also maintaining a useful downlink signal.

Malargüe ground station
The Malargüe station, Deep Space Antenna 3 (MLG, DSA-3), is ESA's newest tracking station. It is located 30 km south of the city of Malargüe, about 1200 km west of Buenos Aires, Argentina. DSA-3 hosts a 35 m-diameter antenna with transmission and reception in the X-band and reception in the Ka-band. The antenna will enter full service in January 2013, providing daily support to missions such as Venus Express.

To prepare for the start of routine operations, numerous tests were performed on the station and the interfaces between the station and other sites. These tests ensure that Venus Express telecommands can be uplinked from the station, and that the station can receive Venus Express telemetry and transmit it to the European Space Operations Centre (ESOC) in Darmstadt, Germany. These tests were performed on 17, 18 and 19 September. As the science data transfer to the ground station was completed early on 24 and 26 September, the operations team also used the extra time on those days to test Malargüe communications with Venus Express. All tests were completed successfully.

New Norcia ground station
All New Norcia (NNO) ground station activities were nominal. The ground station was used for occultation observations from 18 September to 6 October; of these, the observations on 30 September and 2, 4 and 6 October were obtained at orbit pericentre.

High accuracy spacecraft ranging
The Malargüe and Cebreros ground stations were used for a Delta Differential One-way Ranging (delta-DOR, or DDOR) measurement on 16 September. These measurements are carried out with the Venus Express spacecraft on a regular basis to support the accurate determination of the ephemeris for the planet Venus that is maintained by NASA's Solar System Dynamics Group.

For more information about DDOR, see the "Delta-DOR measurements" link in the right-hand menu.

Start of the twenty-second eclipse season
Venus Express's twenty-second eclipse season started on 19 September. During eclipse seasons, as viewed from the spacecraft, Venus occults the Sun for part of each orbit. Eclipse ingress and egress observations were made with the Solar Occultation at Infrared (SOIR) channel of the Spectroscopy for Investigation of Characteristics of the Atmosphere of Venus (SPICAV) spectrometer. The SOIR channel is specially designed to measure atmospheric absorption by observing the Sun through the Venusian atmosphere. SOIR solar occultation observations can only be taken during the eclipse seasons, so for this reason they have a very high scientific priority in those periods. During this reporting period, SOIR ingress or egress observations were taken in roughly half the orbits. Most of these were ingress-only observations, and were followed by the taking of low resolution VMC images of the surface.

For further information, please see 'Science observations with Venus Express during an eclipse' – linked from the right-hand menu.

End of the 13th occultation season
The mission's longest Earth occultation season continued during this period and ended on 6 October; science observations were carried out in 11 orbits, from 18 September to 6 October via ESA's New Norcia ground station.

The occultations occurred before the pericentre, in the ascending branch of the orbit. Therefore, the occultation measurements were often taken in alternate orbits to the SOIR measurements and surface imaging that were carried out for the eclipse season.

Change in Venus Express pericentre altitude during the period from 19 August to 8 December 2012. Credit: ESA

For more information on occultation observations, see the link in the right-hand menu.

Battery charge reconfiguration
In preparation for the start (on 19 September) of the twenty-second eclipse season, the battery end of charge state was raised to 100% (25.2 V) on 17 September, where it will remain until the end of the eclipse season on 19 November 2012.

During solar eclipse seasons, the spacecraft is in complete darkness during a portion of each orbit when Venus blocks out the Sun. At this time, the spacecraft bus and payload are powered by the on-board battery, which must then be recharged to 100% prior to the next eclipse. The battery (composed of three individual battery packs) is sized so that at the end of its life, the spacecraft can go through the longest eclipse and still retain enough stored power for the spacecraft to successfully complete a transition to 'safe mode' in the event of a spacecraft system anomaly.

Outside eclipse seasons, sufficient battery power must be maintained at all times for a transition to safe mode. However, a lower than 100% battery energy level (or end-of-charge state) can be maintained at those times, as no provision is needed for eclipses. Lowering the battery's end-of-charge state prolongs its life.

Time correlation performed
The clock on the Venus Express spacecraft is a simple count-up timer, typical of those used on spacecraft. These clocks save weight and cost but they tend to drift, and must be synchronized – or correlated – with atomic clocks on Earth at regular intervals. One of these regular time correlations was performed on 27 September.

Orbit control manoeuvres
No orbit control manoeuvres were scheduled during this 28-day planning period.

Summary of main activities
The table below shows a chronology of the main spacecraft bus activities in the reporting period:

Main activities during reporting period

ADE = Atmospheric Drag Experiment; CEB = Cebreros; DOR = Differential One-way Ranging; DOY = Day of Year; EOC = End of Charge; MET = Mission Elapsed Time; MLG = Malargüe; NNO = New Norcia; TM = Telemetry

MET
(Day)
Date DOY Main Activity
2504 16-Sep-12 260 CEB communication pass. DDOR performed with NNO. NNO Occultation
2505 17-Sep-12 261 CEB communication pass. TM bit rate set to 182kbps. Batteries EOC set to 25.2 V. Telemetry and telecommand system test with MLG
2506 18-Sep-12 262 CEB communication pass. NNO Occultation. Telemetry and telecommand system test with MLG
2507 19-Sep-12 263 CEB communication pass. Telemetry and telecommand system test with MLG. Start of eclipse season
2508 20-Sep-12 264 CEB communication pass. NNO Occultation. Telemetry and telecommand system test with MLG
2509 21-Sep-12 265 CEB communication pass. Telemetry and telecommand system test with MLG
2510 22-Sep-12 266 CEB communication pass. NNO Occultation
2511 23-Sep-12 267 CEB communication pass
2512 24-Sep-12 268 CEB communication pass. Occultation with NNO. Tests with MLG
2513 25-Sep-12 269 CEB communication pass
2514 26-Sep-12 270 CEB communication pass. Occultation with NNO. Tests with MLG
2515 27-Sep-12 271 CEB communication pass
2516 28-Sep-12 272 CEB communication pass. Occultation with NNO
2517 29-Sep-12 273 CEB communication pass
2518 30-Sep-12 274 CEB communication pass. Occultation with NNO at pericentre
2519 01-Oct-12 275 CEB communication pass
2520 02-Oct-12 276 CEB communication pass. Occultation with NNO at pericentre
2521 03-Oct-12 277 CEB communication pass
2522 04-Oct-12 278 CEB communication pass. Bit rate changed to 152 kbps before CEB pass. Occultation with NNO at pericentre
2523 05-Oct-12 279 CEB communication pass
2524 06-Oct-12 280 CEB communication pass. Occultation with NNO at pericentre
2525 07-Oct-12 281 CEB communication pass
2526 08-Oct-12 282 CEB communication pass
2527 09-Oct-12 283 CEB communication pass; CEB maintenance 10:00 to 15:00 local time
2528 10-Oct-12 284 CEB communication pass; CEB maintenance 10:00 to 15:00 local time
2529 11-Oct-12 285 CEB communication pass
2530 12-Oct-12 286 CEB communication pass
2531 13-Oct-12 287 CEB communication pass

At the end of the reporting period on 13 October, Venus Express was 107.8 million kilometres from Earth. The one-way signal travel time was 570 seconds. The final oxidizer mass was 23.771 kg and the final fuel mass was 14.695 kg.

Scientific focus
This reporting period falls under medium term plan (MTP) #84, which covers the period 16 September to 13 October 2012. A long Earth occultation season, the mission's longest, ended during this period, on 6 October. The twenty-second eclipse (solar occultation) season started on 19 September, providing a long period with simultaneous Earth and solar occultations.

During eclipse seasons, as viewed from the spacecraft, Venus occults the Sun for part of each orbit. Eclipse ingress and egress observations were performed during this reporting period with the SOIR channel of the SPICAV instrument. The SOIR channel is specially designed to observe the Sun through the Venusian atmosphere to measure atmospheric absorption.

SOIR solar occultation observations can only be obtained during the eclipse seasons, making them a scientific priority in these periods. In this reporting period, ingress or egress observations were acquired in roughly half the orbits using the SOIR channel of SPICAV. Most of these were ingress-only observations, and were followed by low resolution imaging of the surface using the Venus Monitoring Camera (VMC).

The local time at ascending node (LTAN) changed from 20:40h to 23:40h. This meant that the season was 'cold', so that pointing the +Z instrument face of the spacecraft at nadir did not expose any thermally sensitive faces of the spacecraft to the Sun.

Venus Express LTAN (19 August to 8 December 2012). Credit: ESA

Venus Express flew over Maxwell Montes (65.2°N, 3.3°E) between 26 September and 6 October (orbits 2350 to 2360). Nadir observations using the SOIR channel of SPICAV and surface images using the Venus Monitoring Camera (VMC) were a top priority during this period. To enable a greater number of eclipse observations, some Earth occultation measurements using the Venus Radio Science instrument (VeRa) were skipped.

Venus Express coverage of Venus (16 September to 13 October 2012). Credit: ESA

Other surface targets included Sif Mons (21°N, 8°W) and Gula Mons (22°S, 1°W) in Western Eistla Regio, which may cover an active section of the Venus mantle. In the southern hemisphere, an important target is Innini Mons (34.7°S, 31.7°W) in Dione Regio, which has been identified as a recently active volcano. It has been estimated that the flows are possibly as geologically recent as 2.5 million years. The Dione Regio region was targeted by the visible channel of the Visible and Infrared Thermal Imaging Spectrometer (VIRTIS) early in this planning period.

Payload activities
 

ASPERA The instrument was regularly operated nominally as part of the routine plan.
MAG The instrument was regularly operated nominally as part of the routine plan.
PFS The instrument was not operated.
SPICAV The instrument was regularly operated nominally as part of the routine plan.
VMC The instrument was regularly operated nominally as part of the routine plan.
VeRa The instrument was regularly operated nominally as part of the routine plan.
VIRTIS The instrument was regularly operated nominally as part of the routine plan.

 
Future milestones

  • Pre-ADE observations for the tenth Atmospheric Drag Experiment campaign
  • Tenth Atmospheric Drag Experiment Campaign
  • Triple planning: Early delivery of three weeks worth of commands to allow for Christmas holidays
  • Start of the fourteenth occultation season

 
---
Legal disclaimer
This report is based on four ESOC mission operations reports, MOR #356 through MOR #359, as well as the MTP84 Master Science Plan. Please see the copyright section of the legal disclaimer (bottom of this page) for terms of use.
 

Last Update: 1 September 2019
27-Dec-2024 00:18 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/ABZ95mA

Related Publications

Documentation