Removal of Mercury Planetary Orbiter from the Large Space Simulator
The Structural and Thermal Model (STM) of the Mercury Planetary Orbiter (MPO) being lifted out of the Large Space Simulator (LSS) by an overhead crane on 15 October 2011, after the completion of thermal balance testing.
Last Update: 1 September 2019