Electrical stack configuration
The ESA-JAXA BepiColombo mission at Europe's Spaceport undergoing intense preparations for launch. Here, the Mercury Planetary Orbiter module (left) and Mercury Transfer Module (right) are moved closer together for an electrical test, whereby the two modules were connected with electric cables.
Last Update: 1 September 2019