Electrical stack configuration
The ESA-JAXA BepiColombo mission at Europe's Spaceport undergoing intense preparations for launch. Here, the Mercury Transfer module (left) and Mercury Planetary Orbiter module (right) are moved closer together for an electrical test, whereby the two modules were connected with electric cables.
Last Update: 1 September 2019