Transfer of FM6 Spacecraft with a Specially Developed Transport Carrier
Date: 19 May 2000
Satellite: Cluster
Copyright: ESA
Show in archive: true
The FM6 spacecraft has been transferred from the Hazardous Processing Facility (HPF) room to the
Payload Processing Facility (PPF) room for the Spacecraft Verification (SVT) test.
Last Update: 1 September 2019