Asset Publisher

Clamp Band Tensioning

Clamp Band Tensioning


Date: 24 June 2000
Satellite: Cluster
Location: Upper Composite Integration Facility, Baikonur, Kazakhstan
Copyright: ESA

Following the lowering of FM 7 on top of FM 6, the clamp band was installed, positioned, centred, and tensionend. The tensioning of the clamp band was not easy as the workers had to operate on a specially made platform between the two spacecraft, which were less than 40 cm apart.
Last Update: 1 September 2019
4-Dec-2024 15:55 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/WLmqg48

Also Available As

Related Images

Related Videos

Related Publications

Related Links

Documentation