Asset Publisher

Tensioning the Clamp Band

Tensioning the Clamp Band


Date: 25 June 2000
Satellite: Cluster
Copyright: ESA

Right after the mating of the FM 6-FM 7 stack on top of the ACU (Adaptateur Charge Utile) adapter, the clamp band was installed, positioned and tensioned.
Last Update: 1 September 2019
10-Oct-2024 23:17 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/wVrEeOw

Also Available As

Related Images

Related Videos

Related Publications

Related Links

Documentation