Tensioning the Clamp Band
Date: 25 June 2000
Satellite: Cluster
Copyright: ESA
Show in archive: true
Right after the mating of the FM 6-FM 7 stack on top of the ACU (Adaptateur Charge Utile) adapter,
the clamp band was installed, positioned and tensioned.
Last Update: 1 September 2019