Asset Publisher

15 July 2000

15 July 2000

15 July 2000

List of nominal times for the events during the launch up to the separation of the launcher's third stage.

Countdown events

Legend:

  • Time: Hours, minutes, seconds. Nominal times only. All times are subject to alteration
  • Countdown to launch is expressed in Boldface

Start of countdown

UTC

Launch time

Event

01:03:35

- 10:10:00

Readiness for launch - 10 hours

01:08:35

- 10:05:00

Network verifications

01:13:35

- 10:00:00

Confirmation of FREGAT readiness for beginning of launch day activities

03:13:35

- 08:00:00

Launcher personnel began operations according to the launch day schedule

03:43:35

- 07:30:00

Beginning of preliminary check-out of Fregat control system

04:08:35

- 07:05:00

Readiness for launch - 7 hours

04:43:35

- 06.30.00

Beginning of Fregat TM system verification

05:08:35

- 06.05.00

Readiness for launch - 6 hours

06:03:35

- 05.10.00

Beginning of FREGAT launch readiness setting

06:08:35

- 05.05.00

Readiness for launch - 5 hours. Electromagnetic environment is nominal

06:53:35

- 04.20.00

Beginning of the State Commission meeting for launcher fuelling authorization

07:03:35

- 04.10.00

Readiness for launch - 4 hours. Weather report is received. Authorization from Comission for Launch Vehicle fuelling. Temperature under the fairing is normal

07:08:35

- 04.05.00

Beginning of Launch Vehicle fuelling with propellant components

08:08:35

- 03.05.00

Readiness for launch - 3 hours

08:08:15

- 02.45.20

Temperatures under the fairing are received

09:08:35

- 02.05.00

Readiness for launch - 2 hours

09:43:35

- 01.30.00

Temperatures under the fairing are received

09:53:15

- 01.20.20

Launch Vehicle is fuelled with all propellant components

10:08:35

- 01.05.00

Readiness for launch - 1 hour

10:18:35

- 00.55.00

FREGAT TM system switched ON

10:38:35

- 00.35.00

Readiness for launch - 30 min

10:43:35

- 00.30.00

FREGAT readiness for servicing tower retraction. Beginning of servicing tower retraction

10:53:35

- 00.20.00

Servicing towers are retracted. Launcher TM system is switched ON. Readiness for launch - 15 min

10:58:15

- 00.15.20

Readiness for launch - 10 min

11:03:05

- 00.10.30

TAPE ADVANCE I

11:03:15

- 00:10:20

Readiness for launch - 5 min. Upper composite Readiness signal is issued

11:07:15

- 00:06:20

Ready for launch at H0 - 1 min report

11:08:15

- 00:05:20

KEY ON START

11:08:35

- 00:05:00

FREGAT transfer to onboard power supply

11:08:35

- 00:05:00

PURGING

11:10:00

- 00:03:35

TAPE ADVANCE II

11:10:15

- 00:03:20

KEY TO THE DRAINAGE

11:11:00

- 00:02:35

Umbilical X02 - X01 drop off command. PRESSURIZATION

11:12:50

- 00:00:45

AIR CONDITIONING SYSTEM SWITCHED OFF. GROUND-BOARD

11:13:15

- 00:00:20

LAUNCH, "ON-BOARD POWER ON"

11:13:18

- 00:00:17

IGNITION, "OXYGEN"

11:13:20

- 00:00:15

PRELIMINARY THRUST LEVEL

11:13:28

- 00:00:07

INTERMEDIATE THRUST LEVEL

11:13:29

- 00:00:06

FREGAT inertial platform release

11:13:32

- 00:00:03

FULL THRUST LEVEL

11:13:35

- 00:00:00

LIFT - OFF

In the case of a hold during the automatic sequence, the spacecraft will stay on internal power.

Post-launch events

Legend:

  • Time: Hours, minutes, seconds. Nominal times only. All times are subject to alteration
  • Time since launch is expressed in Boldface

UTC

Launch time

Event

11:13:35

+ 00:00:00

The command "Lift - off" passed

11:13:45

+ 00:00:10

Nominal flight

11:13:55

+ 00:00:20

Engines of 1st and 2nd stages operate normally

11:14:05

+ 00:00:30

Launch Vehicle control system parameters are nominal

11:14:15

+ 00:00:40

Nominal flight

11:14:25

+ 00:00:50

Launcher and FREGAT structure parameters are nominal

11:14:35

+ 00:01:00

Launcher stabilization is nominal

11:14:45

+ 00:01:10

Pressure in engine chambers is nominal

11:14:55

+ 00:01:20

Pitch, Yaw and Roll are nominal

11:15:05

+ 00:01:30

Flight is nominal

11:15:15

+ 00:01:40

Engines of 1st and 2nd stages operate normally

11:15:25

+ 00:01:50

Launch Vehicle control system operates normally

11:15:35

+ 00:02:00

Cut-off of the lateral booster's engines. Separation of the lateral boosters (118.65 s)

11:15:45

+ 00:02:10

Engine of 2nd stage operates normally

11:15:55

+ 00:02:20

Parameters of control system are normal

11:16:05

+ 00:02:30

Pitch, Yaw and Roll are nominal

11:16:15

+ 00:02:40

Launcher and FREGAT structure parameters are nominal

11:16:25

+ 00:02:50

Launcher stabilization is nominal

11:16:35

+ 00:03:00

Engine of 2nd stage operates normally

11:16:45

+ 00:03:10

Pitch, Yaw and Roll are nominal

11:16:55

+ 00:03:20

Fairing separation accomplished (186.5 s of flight)

11:17:05

+ 00:03:30

Control system parameters are normal. Lift-off time information

11:17:15

+ 00:03:40

Flight is normal

11:17:25

+ 00:03:50

Pressure in engine chambers is normal

11:17:35

+ 00:04:00

Launcher stabilization is nominal

11:17:45

+ 00:04:10

Trajectory parameters are close to nominal ones

11:17:55

+ 00:04:20

Flight is normal

11:18:05

+ 00:04:30

Engine of 2nd stage operates normally

11:18:15

+ 00:04:40

Pressurization of the 3rd stage oxidizer tank was performed

11:18:25

+ 00:04:50

The 3rd stage engine started. The 2nd stage engine cut-off. 2nd stage separation (287.27 s)

11:18:35

+ 00:05:00

Flight is normal

11:18:45

+ 00:05:10

Engine of 3rd stage operates normally

11:18:55

+ 00:05:20

Launcher and FREGAT structure parameters are nominal

11:19:05

+ 00:05:30

Separation of the tail section of 3rd stage (time of separation = 321.83 s)

11:19:15

+ 00:05:40

Control system parameters are normal

11:19:25

+ 00:05:50

Flight is normal

11:19:35

+ 00:06:00

Engine of 3rd stage operates normally

11:19:45

+ 00:06:10

Pitch, Yaw and Roll are nominal

11:19:55

+ 00:06:20

Engine of 3rd stage operates normally

11:20:05

+ 00:06:30

Flight is normal

11:20:15

+ 00:06:40

Launcher stabilization is normal

11:20:25

+ 00:06:50

Trajectory parameters are near to the predicted ones

11:20:35

+ 00:07:00

Control system is normal

11:20:45

+ 00:07:10

Engine of 3rd stage operates normally

11:20:55

+ 00:07:20

Flight is normal

11:21:05

+ 00:07:30

Control system parameters are normal

11:21:15

+ 00:07:40

Stabilization is normal

11:21:25

+ 00:07:50

Flight is normal

11:21:35

+ 00:08:00

Engine of 3rd stage operates normally

11:21:45

+ 00:08:10

Launcher structure parameters are normal

11:21:55

+ 00:08:20

Flight is normal

11:22:05

+ 00:08:30

Trajectory parameters are near to the predicted ones

11:22:15

+ 00:08:40

Control system parameters are normal

11:22:25

+ 00:08:50

Cut off the 3rd stage engine (525.79 s)

11:22:30

+ 00:08:55

Third stage separation from the nose module (529.22 s)

11:22:35

+ 00:09:00

End of launcher ascent reportage. FREGAT is injected to the sub-orbital trajectory

Last Update: 1 September 2019
8-May-2024 02:00 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/WvqMxOw

Images And Videos

Related Publications

Related Links

Documentation