Integral completes test campaign
8 September 1998
Over the summer the INTEGRAL spacecraft has successfully passed thetest campaign of its structural and thermal model.During this test phase, conducted at ESTEC, the spacecraft was also exposed to a space simulation in the Large Solar Simulator (LSS).
Last Update: 1 September 2019