No. 44 - Preparation for Push-broom Operations03 Nov 2005 10:38 Report for period 19 September to 16 October 2005Scientific operations were resumed as planned on 1 October aiming at the conduction of push-broom operations from 20 October to 19 December when the Sun will be within 30° of the orbit plane.
The work of the Mission Control Team has been focused on resuming Science operations and the planning cycle associated to it. In parallel, part of the Flight Control Team were deployed presenting the SMART-1 mission in several forums around the world. This will be completed with the last presentation of the year planned in Princeton in November. Spacecraft StatusAOCS The figure and table below shows the startracker CCD temperatures for the period covered by this report. The temperature for CHU2 CCD has been relatively high during the entire period with an average temperature of 15.87 °C and a maximum temperature of 22.38 °C, but this high temperature was achieved only once. The temperatures for CHU2 have been, most of the times, below 19 °C. The reason for the CHU2 CCD temperature being this high is that the spacecraft has been pointing with its +X axis to the Sun mostly during this period except for few occasions when the spacecraft was pointing with the +X to Earth for high rate communications using the MGA. It is known that pointing the +X axis to the Sun exposes the CHU2 inner baffle slightly which is enough to get the CHU2 CCD temperature close to or above the operational limit. Temperatures for CHU1 have been low for most of the reporting period with temperatures below 10 °C except for few occasions that correspond to MGA pointing to Earth where the peak temperatures reached 19.66 °C. The temperatures for both CHUs decreased after 10 October due to the change of the high thermal mode to low thermal mode. The peak temperatures for CHU1 and CHU2 decreased by approximately 6 °C. After this change the temperatures of the S/C units decreased in general, so the heat flux to the CCD of the CHUs was also reduced.
The following table lists the temperature statistics for this period.
Electric Propulsion, Power and Thermal
A preliminary analysis of the performance of the batteries was performed and for the moment, no degradation was found. The variables as spacecraft thermal mode, spacecraft attitude and consumption are not identical to the previous eclipses, so the comparison is not so straight forward but as a first check, the time to end of charge looks nominal. Further analysis will be performed as the eclipse season evolves. Orbital Information
The changes since apolune 1216 are as follows:
Last Update: 24 Mar 2006
|
|||||||||||||||||||||||||||||||||||