Industrial Team
Industrial consortium during development phase | ||
Country |
Organisation |
Instrument/Device |
Austria |
ORS |
MGSE |
Schrack |
PDRS EGSE |
|
Belgium |
Etca |
Power Subsystem |
Denmark |
Terma |
DC/DC converters |
France |
Aerospatiale |
Prime Contractor |
Dassault/Pyrospace |
Thermal protection |
|
Framatom |
Umbilical connectors |
|
Finland |
Ylinen |
Radar Altmeter |
Germany |
Dasa |
System Integration and Test |
Ireland |
Captec |
Independent S/W validation |
Italy |
Laben |
Data handling subsystem |
Alenia Spazio |
Communication subsystem |
|
Netherlands |
Fokker |
Balloon drop test model |
Norway |
NFT |
System EGSE |
DNV |
Reliability Analysis |
|
Spain |
Casa |
Internal Structure |
Tecnologica |
Parts procurement |
|
Crisa |
Mass dummies |
|
Eyser |
Project control |
|
Sweden |
Saab/Ericsson |
Probe Transmit Antennae |
Esrange |
Balloon drop test |
|
Switzerland |
Contraves/Vevey |
Front shield structure |
CIR |
P/L Interface simulator |
|
United Kingdom |
Logica |
Flight Software |
MBA |
Descent Subsystem |
|
IGG |
Parts Procurement |
|
Irvin |
Parachutes |
|
USA |
Systron Donner |
Accelerometers |
Allian |
Batteries |
Industrial team during cruise phase/operational phase preparation | ||
Country |
Organisation |
Instrument/Device |
France |
Alcatel |
Prime Contractor |
UK |
MBA |
Parachutes |
Vatiaty |
Dynamics and stability |
|
Logica |
Onboard software |
|
Germany |
Astrium |
ENG model/EGSE maintenance |