Industrial Team
| Industrial consortium during development phase | ||
|
Country |
Organisation |
Instrument/Device |
|
Austria |
ORS |
MGSE |
|
Schrack |
PDRS EGSE |
|
|
Belgium |
Etca |
Power Subsystem |
|
Denmark |
Terma |
DC/DC converters |
|
France |
Aerospatiale |
Prime Contractor |
|
Dassault/Pyrospace |
Thermal protection |
|
|
Framatom |
Umbilical connectors |
|
|
Finland |
Ylinen |
Radar Altmeter |
|
Germany |
Dasa |
System Integration and Test |
|
Ireland |
Captec |
Independent S/W validation |
|
Italy |
Laben |
Data handling subsystem |
|
Alenia Spazio |
Communication subsystem |
|
|
Netherlands |
Fokker |
Balloon drop test model |
|
Norway |
NFT |
System EGSE |
|
DNV |
Reliability Analysis |
|
|
Spain |
Casa |
Internal Structure |
|
Tecnologica |
Parts procurement |
|
|
Crisa |
Mass dummies |
|
|
Eyser |
Project control |
|
|
Sweden |
Saab/Ericsson |
Probe Transmit Antennae |
|
Esrange |
Balloon drop test |
|
|
Switzerland |
Contraves/Vevey |
Front shield structure |
|
CIR |
P/L Interface simulator |
|
|
United Kingdom |
Logica |
Flight Software |
|
MBA |
Descent Subsystem |
|
|
IGG |
Parts Procurement |
|
|
Irvin |
Parachutes |
|
|
USA |
Systron Donner |
Accelerometers |
|
Allian |
Batteries |
|
| Industrial team during cruise phase/operational phase preparation | ||
|
Country |
Organisation |
Instrument/Device |
|
France |
Alcatel |
Prime Contractor |
|
UK |
MBA |
Parachutes |
|
Vatiaty |
Dynamics and stability |
|
|
Logica |
Onboard software |
|
|
Germany |
Astrium |
ENG model/EGSE maintenance |