Asset Publisher

CHEOPS Mission Control Room during Launch and Early Orbit Phase

CHEOPS Mission Control Room during Launch and Early Orbit Phase


Date: 19 December 2019
Satellite: CHEOPS
Location: CHEOPS MOC, INTA, Torrejón de Ardoz, Spain
Copyright: ESA–C. Corral van Damme

The CHEOPS team on 19 December 2019 in the Mission Control room during the Launch and Early Orbit Phase (LEOP) at the Mission Operations Centre (MOC) at INTA in Torrejón de Ardoz, near Madrid, Spain.

After launch on 18 December, the CHEOPS team at the MOC verified that the spacecraft is in a stable attitude and that the propulsion module, along with all onboard systems and units, are working correctly. Orbit correction manoeuvres were performed and the LEOP was completed successfully on 23 December. The spacecraft will start the in-orbit commissioning phase on 8 January 2020.

Last Update: 7 January 2020
21-Dec-2024 14:44 UT

ShortUrl Portlet

Shortcut URL

https://sci.esa.int/s/WX9Qkb8

Also Available As

Related Images

Related Videos

Related Publications

Related Links

See Also

Documentation