Mission StatusXMM-Newton operations are continuing smoothly, with the spacecraft, instruments and ground segment all performing nominally. Operations are funded until 31 March 2010.
Published: 23 May 2007
The performance of the Cassini Orbiter is nominal and preparing for mission extension, which is expected to be announced by NASA in early summer.
Published: 23 May 2007
Mission StatusThe spacecraft status is nominal, with the High Gain Antenna (HGA) Z-axis in a fixed position.
Published: 22 May 2007
Mission StatusThe spacecraft has completed its third South Polar Pass in April, having reached maximum southern latitude (-79.7° heliographic) on 7 February. The spacecraft subsystems and science instruments remain in good health, with no anomalies during the reporting period.
Published: 22 May 2007
Mission StatusDespite the partial loss of the Advance Camera for Surveys (ACS), the Hubble Space Telescope continues to provide excellent data and exciting scientific results.
Published: 22 May 2007
Report for period 13 May to 19 May 2007The Entry in the Quadrature phase with fake ephemeris has been successful. The temperatures of all subsystems are also within limits. In order to perform science during this phase, a 17 hour cooling is required before any S/C communication. This has forced the missing of some of the passes at Cebreros. Not...
Published: 20 May 2007
Report for Period 6 May to 12 May 2007With the installation of AOCMS_SW patch 14 and the update of the on-board ephemeris, Venus Express was configured for the quadrature phase. This phase is defined as the period during which the Sun-Spacecraft-Earth angle is between 75° and 95°.
Published: 16 May 2007
Report for Period 21 April to 11 May 2007The reporting period covers a period of three weeks of limited science observations and navigation after the successful execution of the deep space manoeuvre 3. The Jupiter observation campaign with the ALICE instrument continued till beginning of May.
Published: 14 May 2007
Report for Period 29 April to 5 May 2007During the reporting period the mission operations have been conducted according to the plan.Science operations have been nominal.
Published: 14 May 2007
Report for Period 22 April to 28 April 2007During the reporting period the mission operations have been conducted according to the plan and science operations have been nominal.
Published: 7 May 2007
Report for Period 15 April to 21 April 2007During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal.
Published: 27 April 2007
Report for Period 24 March to 20 April 2007The reporting period covers a period of four weeks of limited science observations and navigation in preparation of the deep space manoeuvre 3.
Published: 25 April 2007
Report for Period 8 April to 14 April 2007During the reporting period the VIRTIS movie observations have taken place. The resulting science data have been received on ground in its entirety via DSN station DSS-63 (Madrid, 70m diameter), with Cebreros serving as backup in shadow-track. No data loss has been reported.
Published: 25 April 2007
Report for Period 1 April to 7 April 2007During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal.
Published: 25 April 2007
Report for Period 25 March to 31 March 2007During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal.
Published: 2 April 2007
Report for Period 10 March to 23 March 2007The reporting period covers a period of 2 weeks of various activities following the Mars swing-by, including:Jupiter observations by ALICEAOCS EEPROM SAM patch removalROSINA Delta-commissioning
Published: 26 March 2007
Report for Period 17 March to 24 March 2007During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal.
Published: 26 March 2007
Report for Period 11 March to 17 March 2007During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal.
Published: 18 March 2007
Report for Period 25 February to 9 March 2007The reporting period covers a period of two weeks following the Mars swing-by on 25 February 2007.
Published: 14 March 2007
Report for Period 04 March to 10 March 2007During the reporting period the mission operations have been conducted according to the plan. Science operations have been nominal.