• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Rosetta

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Mission Team
    • Orbit View
    • Background Science
    • 67P/C-G
    • (2867) Steins
    • (21) Lutetia
    • Asteroids
    • Map of Lutetia
    • Orbiter
    • 3D Model
    • Instruments
    • Engineering
    • Lander
    • Instruments
    • Mission Operations
    • Mission Operations
    • Launch Vehicle
    • 2nd Rosetta Launch Campaign
    • Launch Information
    • ESOC Info
    • Science Operations
    • RSOC
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Status Report Archive
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Rosetta is ready for the New Year

    18 Dec 2003 12:00

    Kourou, French Guiana

    On 28 November 2003 it was time for the deployment test of the re-installed High Gain Antenna (HGA). The test was successful. After the test the antenna was returned to the stowed position for the launch. 

    Deployment test of the High Gain Antenna

    On 1 December 2003 the Austrian Aerospace MLI team was busy with the Multi Layer Insulation (MLI) finalisation. In parallel to the MLI finalisation activities an Abbreviated Functional Test was being Run.

    Installing the MLI

    Solar Array deployment

    Rosetta activities in Kourou were finished for this year on 3 December 2003. The spacecraft is now in baby-sitting mode and the team size in Kourou has been reduced to the minimum. The activities in Kourou will re-commence with the refuelling activities mid-January next year.

    The Rosetta Team wishes you Merry Christmas and A Happy New Year!

     


    Last Update: 25 Mar 2004

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=34389
    • Images and Videos
    • Deployment test of High Gain Antenna
    • Deployment test of High Gain Antenna
    • Deployment test of High Gain Antenna
    • Installing the Multi Layer Insulation (MLI)
    • Deployment of the Solar Array
    • Journal
    • Archives
    • See also
    • 05 March 2004
    • 02 March 2004 - Launch
    • 01 March 2004
    • 27 February 2004 - II
    • 27 February 2004 - I
    • 26 February 2004
    • 25 February 2004
    • 23 February 2004
    • 17 February 2004
    • 13 February 2004
    • 12 February 2004
    • 11 February 2004
    • 10 February 2004
    • 05 February 2004
    • 18 December 2003
    • 26 November 2003
    • 21 November 2003
    • 07 November 2003
    • 2nd Rosetta Launch Campaign

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions