• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Rosetta

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Mission Team
    • Orbit View
    • Background Science
    • 67P/C-G
    • (2867) Steins
    • (21) Lutetia
    • Asteroids
    • Map of Lutetia
    • Orbiter
    • 3D Model
    • Instruments
    • Engineering
    • Lander
    • Instruments
    • Mission Operations
    • Mission Operations
    • Launch Vehicle
    • 2nd Rosetta Launch Campaign
    • Launch Information
    • ESOC Info
    • Science Operations
    • RSOC
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Status Report Archive
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    No. 153 - Orbit determination and spacecraft reconfiguration

    21 Mar 2011 14:00

    Report for the period 19 February to 4 March 2011

    This report covers 14 days of Rosetta mission operations. The main activities were delta differential one-way ranging (DDOR) to determine the outcome of the burns performed during the previous reporting periods as part of the first rendezvous manoeuvre (RDVM#1) and reconfiguration of the spacecraft upon completion of the manoeuvre.

    Orbit determination following the set of burns for RDVM# 1 has revealed that the manoeuvre was almost perfect and any correction would have required a Trim 2 burn with a ΔV of a few millimetres per second – well below the threshold where a correction is considered necessary. With this manoeuvre completed, the spacecraft is now on a fly-by trajectory for Comet 67/P Churyumov-Gerasimenko with a miss-distance of about 50,000 kilometres. After the completion of the RDVM#1 activities the spacecraft has been changed back to its normal configuration and is ready to complete pre-hibernation activities.

    During the reporting period, mission operations were conducted using the ESA New Norcia (NNO) and Cebreros (CEB) ground stations and the DSS 14 (Goldstone, 70 metres), DSS 24 (Goldstone, 34 metres), DSS 25 (Goldstone, 34 metres), DSS 26 (Goldstone, 34 metres), DSS 34 (Canberra, 34 metres), DSS 45 (Canberra, 34 metres), DSS 54 (Madrid, 34 metres), and DSS 55 (Madrid, 34 metres) NASA Deep Space Network (DSN) antennas.

    Main activities during reporting period

    DoY Date Pass Activity
    053 22-Feb-2011 DSS-26 2555
    DSS-14 2555
    DSS-45 2555
    Monitor
    DDOR
    DDOR
    054 23-Feb-2011

    NNO 2255
    CEB 2556
    DSS-54 2556
    NNO 2556

    DDOR
    DDOR
    Monitor
    Monitor
    055 24-Feb-2011 DSS-255 2557
    NNO 2557
    Monitor
    056 25-Feb-2011 NNO 2257
    CSB 2258
    057 26-Feb-2011 DSS-55 2559
    DSS-26 2559
    NNO 2559
    Monitor
    058 27-Feb-2011 DSS-26 2560 Monitor
    059 28-Feb-2011 DSS-54 2561
    NNO 2561
    Monitor
    060 1-Mar-2011 DSS-26 2562 Monitor
    061 2-Mar-2011 DSS-54 2553
    NNO 2563
    Monitor
    062 3-Mar-2011 DSS-24 2554
    NNO 2564
    Monitor
    063 4-Mar-2011 DSS-26 2565 Spacecraft reconfigured after RDVM#1

    DoY = Day of year

    At the end of the reporting period on 4 March, Rosetta was 533.2 million kilometres from Earth (3.56 AU); one-way signal travel time was 1779 seconds (29 minutes 39 seconds). The distance from the Sun was 610.3 million kilometres (4.08 AU).

    Spacecraft

    Payload Status
    ALICE The instrument is currently OFF.
    CONSERT The instrument is currently OFF.
    COSIMA The instrument is currently OFF.
    GIADA The instrument is currently OFF.
    MIDAS The instrument is currently OFF.
    MIRO The instrument is currently OFF.
    OSIRIS The instrument is currently OFF.
    ROSINA The instrument is currently OFF.
    RPC The instrument is currently OFF.
    RSI The USO is ON/muted since 3 February 2010 (DoY 032/2010).
    VIRTIS The instrument is currently OFF.
    Lander (Philae) The instrument is currently OFF.
    SREM The instrument is ON with standard settings since 3 February 2010 (DoY 032/2010).

    Future Milestones

    Activities linked to RDVM#1 are now complete, with the flight plans now focussing on the remaining payload activities to be completed by the end of March. The spacecraft will then be ready for the opposition phase in April and May.

    Summary of upcoming events:

    • 05 March 2011: MIDAS activities
    • 06 March 2011: ALICE activities
    • 22-25 March 2011: OSIRIS activities
    • 12 April 2011: Start of opposition phase
    • 20 May 2011: End of opposition phase
    • 08 June 2011: Hibernation entry

    ---
    Legal disclaimer
    This report is based on the ESOC mission operations report, WOR #153. Please see the copyright section of the legal disclaimer (linked from the home page http://sci.esa.int) for terms of use.


    Last Update: 05 Mar 2012

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=49818
    • Status Reports
    • Archives

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions