No. 110 - Spacecraft and payload ninth check-out
Mission operations have been conducted with support of the ESA New Norcia (NNO) ground station.
DOY | Date | Pass | Main Activity |
019 | 19/01/09 | NNO 1789 |
Monitoring |
026 | 26/01/09 | NNO 1796 |
Spacecraft check-out 9, day 1 |
027 | 27/01/09 | NNO 1797 |
Spacecraft check-out 9, day 2 |
033 | 02/02/09 | NNO 1803 |
Payload check-out 9 - data downlink |
034 | 03/02/09 | NNO 1804 |
Payload check-out 9 - data downlink |
035 | 04/02/09 | NNO 1805 |
Payload check-out 9 - data downlink |
040 | 09/02/09 | NNO 1810 |
RSI check-out 9 |
042 | 11/02/09 | NNO 1812 |
Monitoring |
044 | 13/02/09 | NNO 1814 |
Monitoring |
At the end of the reporting period (DoY 044) Rosetta was at 457.55 million km from Earth (3.05 AU) and the one-way signal travel time was 1526 seconds. The distance to the Sun was 332.33 million km (2.22 AU).
Spacecraft
Payload
The instruments were activated as part of the payload check-out 9 activities. The Standard Radiation Environment Monitor (SREM) continues to run in the background.
ALICE
The instrument was activated without problems as part of payload check-out 9 activities.
CONSERT
The instrument was activated without problems as part of payload check-out 9 activities.
COSIMA
The instrument was activated without problems as part of payload check-out 9 activities.
GIADA
The instrument was activated without problems as part of payload check-out 9 activities.
MIDAS
The instrument was activated without problems as part of payload check-out 9 activities.
MIRO
The instrument was activated without problems as part of payload check-out 9 activities.
OSIRIS
The instrument was activated without problems as part of payload check-out 9 activities.
ROSINA
The instrument is OFF.
RPC
The instrument was activated without problems as part of payload check-out 9 activities.
RSI
The instrument was unmuted and connected to the Telemetry, Tracking and Command (TTC) subsystem on DoY 040 for the check-out 9 activities. The procedure, which had some problems during check-out 8, was run successfully without problems.
VIRTIS
The instrument is OFF.
LANDER Philae
The instrument was activated without problems as part of payload check-out 9 activities.
SREM
Since DoY 026/2009 the accumulation settings are configured for active cruise mode.
Future Milestones
The active cruising phase will continue until March when Deep Space Manoeuvre 4 will be conducted in preparation of the third and last Earth swing-by planned for 13 November 2009.
The manoeuvre will be followed by a short tracking campaign with the spacecraft being configured for a near-Sun hibernation phase to last until beginning of September.
---